Serving & counter openings
Discuss fire separation for suitable canteen, kitchen or counter openings. The shutter arrangement must be compatible with the wall, opening and required performance.
Get a quoteKSF / FIRE RATED SHUTTERS
Fire-rated shutters with a four-hour test result and rapid seven-day turnaround.
Manufactured by KSF for projects where documented performance and responsive delivery matter.

TESTED PERFORMANCE. RESPONSIVE MANUFACTURE.
KSF fire shutters withstood the full four-hour maximum testing duration at Warringtonfire, with certification following the test.
We offer a rapid seven-day turnaround on fire-rated shutters. Send your specification and required date so we can confirm the applicable lead time and delivery arrangements in your quotation.
Fire performance applies to the tested and approved construction. Opening dimensions, supporting structure, fitting details and the required rating must fall within the applicable certification scope.
SPECIFIED FOR YOUR BUILDING
SPECIFY THE COMPLETE ASSEMBLY
DOCUMENTATION THAT FITS YOUR PROJECT
Request KSF’s applicable Warringtonfire test and certification documentation before finalising your specification. Our team can help establish the permitted opening sizes, construction, supporting structure and installation details for your proposed shutter.
A four-hour fire test does not by itself establish smoke-control or thermal-insulation performance. Any additional performance required by the project must be supported by the relevant evidence.
Request certification & specification ↗FIRE SHUTTERS, EXPLAINED
The tested KSF fire shutter withstood the full four-hour test. The performance that can be specified for an individual opening depends on the applicable certification scope, dimensions and installation details.
KSF offers a rapid seven-day turnaround service. Confirm the specification, order requirements, availability and agreed dispatch or delivery date in your quotation. Installation scheduling is agreed separately.
Provide the required alarm interface and cause-and-effect sequence. KSF will confirm a suitable control arrangement for the proposed shutter and project requirements.
Contact KSF for the current documentation relevant to your proposed opening. This ensures you receive the applicable evidence and installation requirements rather than a generic product claim.
MANUFACTURE. SUPPLY. INSTALL.
Send your opening dimensions, photographs, site postcode and required date. Choose trade supply or discuss survey and installation.
Request a quote ↗LET’S BUILD SOMETHING BETTER