MANUFACTURE / SUPPLY / INSTALLMade in the UK · Delivered nationwide
Get a quote

KSF / CURTAIN WALLING

Architectural clarity.
Technical depth.

Exlabesa KLW and ECW-50 curtain walling, coordinated by KSF for considered commercial façades.

Curtain Walling
Exlabesa KLW architectural reference image. Not presented as a KSF installation.

EXLABESA / TWO SYSTEMS

One architectural language.
Two specification routes.

01 / KLW

Refined, adaptable screens.

A channel-and-plate system with interchangeable mullions and transoms, a flush internal finish and a choice of external caps. Faceted sections support angled layouts; compatible window and door inserts complete the elevation.

02 / ECW-50

Greater structural choice.

A broader range of profile depths and glazing build-ups for demanding façade briefs. Reinforcement and compatible inserts allow the assembly to be developed around the project’s loading and environmental requirements.

TECHNICAL COMPARISON

Specify with clarity.

System characteristicKLWECW-50
Visible face width50mm50mm
Mullions50–125mmUp to 250mm
Transoms50–125mmUp to 195mm
Glazing28mm standard; maximum 34mm6–46mm, including suitable triple-glazed units
Thermal breakPolyamidePolyamide
Glass weightConsult Exlabesa technical departmentUp to 350kg, dependent on wind load and configuration
Published testingBS 6375-1:2015 air, water and wind testingCWCT 2005 methods, sections 5, 6, 7, 9, 11, 12, 15; BS EN 13050:2011

Manufacturer-published information from the linked technical sheets. These are system capabilities, not a project-specific performance declaration. Maximum dimensions, loads and glazing combinations must be confirmed together.

FROM ELEVATION TO DETAIL

Resolve the interfaces early.

Exlabesa KLW curtain wall mullion and transom system visualisation
Exlabesa KLW system reference.
Structure & movement
Agree wind loads, deflection limits, support points, slab movement and fixing zones with the project structural designer.
Glazing & thermal brief
Confirm glass build-up, solar control, light transmission, acoustic requirements and whole-façade thermal targets. U-values depend on geometry and glazing.
Water & air management
Coordinate drainage, perimeter seals, flashings and interfaces with adjacent construction. Request applicable test evidence for the proposed assembly.
Entrances & opening lights
Resolve door and window inserts, thresholds, access and maintenance requirements as part of the elevation.

FABRICATION & PROJECT COORDINATION

A clear route to manufacture.

01

Design brief

Issue elevations, sections, opening schedules and performance requirements. Identify the structural designer, façade interfaces and submission requirements.

02

Technical coordination

Agree system selection, glass make-up, profile depths, finish and fixing principles. Request relevant drawings, calculations and test documentation for review.

03

Approved information

Confirm coordinated manufacturing details and the supply or installation scope before release. Plan access, lifting and sequencing alongside the site programme.

ARCHITECT & SPECIFIER RESOURCES

The source documents.

Request the current technical manual, relevant CAD details and applicable test certificates through KSF. Confirm revisions and project suitability before specification.

Request a technical review ↗

KSF / PROJECT EXPERIENCE

Built around real programmes.

Byron House in Newcastle

Byron House, Newcastle

Exlabesa KLW curtain walling, delivered as part of KSF’s phased installations over three years. Explore our work on this substantial accommodation project.

View the project ↗

UK MANUFACTURING / NATIONWIDE SUPPORT

Start with the opening.

Send elevations, dimensions, photographs, location and the required programme. Tell us whether you need trade supply or installation.

Discuss your project ↗

LET’S BUILD SOMETHING BETTER

Your next project.
Our manufacturing expertise.

Talk to KSF